Automating Construction Progress: Weekly Drone Photogrammetry and Earthwork Volumetrics
Automating Construction Progress: Weekly Drone Photogrammetry and Earthwork Volumetrics
Building a master-planned community is a massive coordination exercise. Hundreds of acres are cleared, graded, drained and paved. Multiple contractors work in parallel. Materials arrive and move around the site daily. And investors, many of whom may be in another state or country, want regular, trustworthy updates on progress.
With automated drone photogrammetry flights on a weekly basis, a site can be turned into a measurable digital model that can be used by builders, contractors and investors alike.
What Drone Photogrammetry Delivers
The process of taking photographs to measure objects, structures, etc. is referred to as photogrammetry. A drone, which is set to fly on a pre-programmed route, takes many photographs of the site to create high-quality aerial images. These images are then processed to create a variety of different outputs, including:
•Orthomosaics: high-resolution, map-accurate aerial images of the entire site
•Digital surface and terrain models: 3D elevation data showing grades and contours
•3D point clouds and meshes: detailed models for visualization and measurement
•Volume calculations: precise measurements of cut, fill and stockpiles
With the use of RTK or PPK and ground control points, the resulting data can have centimeter-level accuracy, making it suitable for earthwork monitoring and other types of progress tracking.
Why Weekly Flights Matter
A single survey is useful. A weekly cadence is transformational. Repeating the same automated flight path every week creates a consistent time series of the site. Managers can compare this week to last week, see exactly what changed and identify where progress has stalled.
Using automation for the mission planning and execution of the drone as well as for the data processing helps to complete the job in a very efficient way. After setting up the mission for the first time, the drone can be flown on the same route with very little effort. Also the data processing can be done in a very standard way and the results can be available within a day or two.
Verifying Grading Contractor Progress
Measuring the quantity of earthwork for payment is critical to ensuring that the builder is paying for only what was actually completed. By comparing the terrain model to the design surface, you can determine the quantity of cut and fill completed to date as well as what is left to be completed. The cut-and-fill can be displayed as a heat map to help identify areas that may be over- or under-graded prior to proceeding to the next phase of construction.
This data can be used to prove that a builder has completed certain portions of work and can be used to apply for payment for those portions. It will also serve to help verify that the contractor has completed the work as specified and can be used to resolve any disputes that may arise.
Tracking Materials and Stockpiles
On large construction sites, the amount of fill dirt, sand, aggregate, etc. can be measured to track usage rates, to determine when more materials need to be ordered, and to determine if there has been any discrepancy between what was delivered and what was invoiced.
•Reconcile deliveries against invoices
•Monitor usage rates and forecast reorders
•Reduce waste and loss by catching discrepancies early
Better tracking of materials over the long term of a project can result in significant savings.
Keeping Out-of-State Investors Informed
This same data can be used to inform out-of-state investors and lenders of the progress of the project. This can be done by providing them with the weekly orthomosaics, before and after photos, and even short flyover videos. The images can be placed on the builder’s online portal and distributed in monthly investor reports.
The same data used to prove progress to capital providers can also be used to market a project to prospective buyers. Pre-construction flyovers can be used to showcase roads, amenities, and model homes under construction on a master-planned community development.
Supporting Drainage and Stormwater Planning
As communities are designed as master planned communities, the stormwater system will include many features like retention ponds, swales and culverts. Terrain models from the drone can be used to verify that the grades are directing the water where intended and that the retention ponds are being excavated to the correct depth and shape.
Integrating Drone Data into Project Workflows
To maximize value from the drone deliverables, they should be integrated into the existing tools of the builder. This means that the orthomosaic and the surface can be exported to CAD/GIS and then can be overlaid on the site plan and shared with the engineers and superintendents on the site.
Compliance and Safety
All commercial drone flights are conducted under the purview of FAA Part 107 by remote pilots with required airspace authorizations as needed. For active construction sites, drone flights will be coordinated with the site superintendent and flights will be avoided over workers on the ground where not permitted by local, state or federal regulations. All such flights will also adhere to the safety guidelines of the site.
Building Smarter from Above
For builders of master-planned communities, weekly drone photogrammetry turns a complex, fast-moving site into a measurable, transparent operation. It verifies progress, protects budgets and keeps everyone, from superintendents to distant investors, working from the same picture.
TiKi Aerial Media can support builders and developers across Southwest Florida with recurring aerial progress documentation. Contact us to set up a flight schedule for your next community.
TiKi Marine Media: Your Story from Above.
(941) 500-4272 / [email protected] / Book here: https:book.tikiaerialmedia.com